Know your next move.
DLMT maps the approvals your property needs, explains your options, and helps you move forward—with guidance at every step.
Starting in Central TexasConfirm water capacity
Ask the utility for available fire flow, the pressure at that flow, and whether a fire pump may connect.
To: Water utility, Plum Creek system Subject: Fire flow and service availability for a planned industrial building Hello, We are planning a 24,000 SF sprinklered industrial building at [address] (parcel [ID]). Could you please confirm: 1. Available fire flow at the nearest hydrant 2. Residual pressure at that flow 3. Whether a fire pump may connect to your main Thank you, [Name] · [Company] · [Phone]
- Status
- Confirmed · sample
- Responsible
- County development services; Commissioners Court approves the replat
- Depends on
- Nothing. This comes first.
- Sources
- County subdivision rules (verified) · recorded replat (sample document)
- Next action
- None. Complete.
- Status
- In review · sample
- Responsible
- County; commercial septic designs are approved by the Commissioners Court
- Depends on
- Legal lot
- Sources
- County septic rules (verified) · docket date (needs confirmation)
- Next action
- Confirm the docket date with county staff.
- Status
- Needs confirmation · sample
- Responsible
- Water utility supplies it; the county fire marshal sets the requirement
- Depends on
- Building size and sprinklers
- Sources
- Adopted fire code, fire flow appendix (verified) · available flow and pressure (needs confirmation)
- Next action
- Send the utility request. This is your next move.
- Status
- Not started · sample
- Responsible
- County fire marshal, with a third-party plan reviewer
- Depends on
- Water capacity
- Sources
- County fire code (verified)
- Next action
- Wait for the water capacity answer.
Best case (14 weeks) assumes the utility confirms enough flow at pressure, the septic design is approved at the next docket, and no redesign is needed.
Worst case (26 weeks) assumes on-site water storage is required, which means a redesign and another review, and the docket slips one cycle.
These ranges are for this demonstration only. In a real plan, every duration shows its source.
- Send the utility requestFlow, pressure, pump allowance · you send it, DLMT drafts itNext move
- Confirm the septic docket dateCounty development servicesAfter that
- Fire marshal pre-application meetingOnly if the flow comes back shortIf needed
Verified in this sample
- County fire code, fire flow appendixAdopted code text
- County subdivision and septic rulesAdopted regulations
- Water utility service areaState public data
Needs confirmation
- Available fire flow and pressureUtility letter requested
- Septic docket dateCounty staff
See the regulations and data behind each step.
Know what we're assuming about your site.
Get updated next steps when things change.
A clear plan. Support at every step.
One issue from the sample above, start to finish. Example
What applies, and who decides
- ✓County rules apply; the site is outside city limits.
- ✓The adopted fire code sets a minimum fire flow for a sprinklered building this size.
- ?Whether the water line can deliver that flow: needs confirmation.
Three ways it can go
One action decides it
When the answer comes back, the plan updates: the issue clears, or the next step moves to Plan B or C.
Concrete answers, not “may be an issue.”
An approval map
Every approval your project needs, in order, and the office that decides each one.
1 Legal lot → County / Commissioners Court
2 Septic → Commissioners Court
3 Fire plan review → County fire marshalIssues with options
Each issue marked confirmed, needs confirmation, or a real caution, with the paths that work.
Water capacity · needs confirmation
A line is enough · B fire pump · C storageDrafts and meeting prep
The request to send, the questions to ask staff, and what to get in writing.
Draft: utility request for flow, pressure
and fire pump allowanceSources and assumptions
What's verified, what still needs confirming, and what each timeline assumes.
Verified: adopted fire code
Needs confirmation: available flowGet a clear path for your next site.
We're opening DLMT to a small group of developers, landowners and civil engineers first, starting in Central Texas.